NS Power filed the 2020 Integrated Resource Planning Report with the Nova Scotia Utility and Review Board on November 30, 2020. NS Power provided an IRP Action Plan update in January of 2022 and initiated the 2022 evergreen IRP process. Review the planning tools, models, scenarios, Action Plan Updates and evergreen IRP material below.
2022 EVERGREEN IRP
Evergreen IRP process materials
Documents
- 2022 Evergreen IRP Study Scope and Timeline (PDF)
- April-6th-2022-IRP-Update-Workshop-and-Evergreen-Scope-Feedback-Summary (PDF)
- 2022-Evergreen-IRP-Assumptions (PDF)
- 2022-Evergreen-IRP-Modeling-Scenarios-and-Early-Insights (PDF)
- Evergreen-IRP-Assumptions-Modeling-Scenarios-Early-Insights-Responses-to-Stakeholder-Feedback-July-29-2022 (PDF)
- 2022-Evergreen-IRP-Assumptions-Updated (PDF)
- 2022-Evergreen-IRP-Updated-Modeling-Scenarios (PDF)
- Evergreen-IRP-Update-January-2023 (PDF)
- 2022-Evergreen-IRP-Updated-Assumptions-January-2023-Update (PDF)
- evergreen-IRP-Updated-Assumptions-and-Draft-Modeling-Results-Stakeholder-Feedback-and-NS-Power-Responses (PDF)
- Atlantic-Loop-Energy-Pricing (XLSX)
- evergreen-IRP-Final-Modeling-Results-2023 (PDF)
- evergreen-IRP-Final-Modeling-Results-Data-Tables-2023 (XLSX)
- Evergreen-IRP-Updated-Modeling-Scenarios-Descriptions (PDF)
- Evergreen-IRP-Update-to-IRP-Action-Plan-and-Roadmap-2023 (PDF)
- evergreen-IRP-Final-Modeling-Results-Summary-of-Stakeholder-Feedback-and-NSPI-Responses (PDF)
IRP ACTION PLAN UPDATES
The January 2022 IRP Action Plan Update with additions in April 2022 is here. The Update also includes information about the 2022 Evergreen Process to reflect significant policy and legislative changes since the 2020 IRP.
Documents
- IRP-Action-Plan-Update-April-2022 (PDF)
- Previous version: 20220121-NSPI-to-NSUARB-IRP-Action-Plan-Update (PDF)
- IRP-Action-Plan-Update-February-2023 (PDF)
- Wind-Integration-Study-Large-Scale-Integration-of-IBR-in-Nova-Scotia-Public (PDF)
- E3_NS-Power_Electrification-Report (PDF)
- Wind-Integration-Study-February-2-2024-Engagement-Session-Material (PDF)
- Electrification-Strategy-Report-February-2-2024-Engagement-Session-Material (PDF)
2020 IRP - PRESENTATIONS
The following documents were presented at various stakeholder sessions.
Documents
- IRP-Draft-Findings-Workshop-2020-09-10 (PDF)
- IRP-Modeling-Results-Workshop-2020-07-09 (PDF)
- 20200427-Interim-Modeling-Update-Workshop-2020-04-28 (PDF)
- 2020-IRP-Draft-Analysis-Plan (PDF)
- 2020-IRP-Assumptions-Set-Draft-and-Updates (PDF)
- 20190807-01_Pre-IRP-Deliverables-Introduction (PDF)
- 20190807-02_-E3-Capacity-Study-Overview (PDF)
- Attachment-2-NSPI-E3-Supply-Options-Study (PDF)
- Attachment-4-NSPI-PSC-Renewable-Integration-Study (PDF)
- Attachment-3-NSPI-DR-Program-Overview (PDF)
- E1-Potential-Study-Presentation_June28 (PDF)
- E3-Industry-Trends-and-IRP-101-Stakeholder-Session-6-28-19 (PDF)
- 20190628-NSP-Deliverables-Status (PDF)
- 20190524-IRP-Stakeholder-Update (NSP)
- Interim-Modeling-Update-Workshop-2020-04-28 (PDF)
2020 IRP - BACKGROUND MATERIALS
Reference materials related to the 2020 IRP process.
Documents
- Synapse-Final-Report-Generation-Optimization-and-Utilization-May-1-2018 (PDF)
- Bates-White-FAM-Audit-Report-July-24-2018 (PDF)
- UARB-2020-IRP-Initiation-and-Pre-IRP-Board-Orders-October-5-2018 (PDF)
- 20190702-2019-10-Year-System-Outlook (PDF)
- 20181221-NS-Power-Hydro-Asset-Study-REDACTED (PDF)
- 20190430-2019-Load-Forecast-Report-REDACTED (PDF)
2020 IRP - PREVIOUS IRPS - REFERENCE
Previous IRP submissions are listed here.
2020 IRP - PRE-IRP DELIVERABLES FINAL REPORT
In its Order initiating the 2020 IRP process, the NSUARB requested NS Power complete several Pre-IRP Deliverables prior to the initiation of the formal process. NS Power issued the Capacity Study, Renewables Integration Study, Supply Options Study, and Demand Response program details on July 31, 2019. In addition, the Company hosted four Engagement Sessions on the study work and met with numerous stakeholder groups in an effort to identify and discuss a variety of issues relevant to the planning process. Enclosed are reports, materials and the responses to questions from stakeholders related to the Pre-IRP process.
Documents
- 20191018-NS-Power-Pre-IRP-Final-Report-updated (PDF)
- Previous version: October-18-2019-NS-Power-Pre-IRP-Deliverables (PDF)
- Appendix-A-Att-A-1-E3-Wind-Profiles-Actual-vs-Simulation (XLSX)
2020 IRP - TERMS OF REFERENCE
202 IRP - Assumptions and Analysis Plan
Documents shared with stakeholders.
Documents
- 20200311 IRP Assumptions Final (PDF)
- Previous Version: 20200203 IRP Assumptions Set just updates (PDF)
- Previous Version: 2020 IRP Assumptions (PDF)
- 20200311 IRP Assumptions Response to Comments (PDF)
- Previous Version: 20200227 Assumptions Stakeholder Comments (PDF)
- 20200227 Hydro Asset Study presentation (PDF)
- 20200227 Deep Decarbonization Pathways Phase 1 (PDF)
- 2020 IRP Draft Analysis Plan (PDF)
- 20200214 AREA comments on draft assumptions (PDF)
- 20200214 RII CA comments on draft assumptions (PDF)
- 20200214 CanWEA_CanSIA comments on draft assumptions (PDF)
- 20200214 Dalhousie comments on draft assumptions (PDF)
- Digby Comments and submissions (PDF)
- 20200214 EAC comments on draft assumptions (PDF)
- 20200214 E1 comments on draft assumptions (PDF)
- 20200214 Heritage Gas comments on draft assumptions (PDF)
- 20200214 JFS_Hydrostor comments on draft assumptions (PDF)
- 20200218 Envigour comments on draft assumptions (PDF)
- 20200214 SBA comments on draft assumptions (PDF)
- 20200216 Verschuren comments on draft assumptions (PDF)
- 2020 Bates Whites Comments re IRP (PDF)
- IRP Modeling Results 2020 06 26 (PDF)
2020 IRP - Scenarios and Modeling
Documents
- NSP response to Comments May 2020 (PDF)
- IRP Participant Comments Interim Modeling May 2020 (PDF)
- 20200427 Interim Modeling Update Workshop (PDF)
- 20200311 IRP Scenario and Modeling Plan (PDF)
- Previous Version: 20200227 Scenarios and Modeling Plan (PPT)
- Previous Version: 20200226 IRP Draft Scenarios (PDF)
- Previous Version: 20200214 IRP Draft Scenarios (PDF)
- 20200311 IRP Modeling Plan and Scenarios Comments (PDF)
- 20200225 revised E3_NSPI Pathways Study (PDF)
- Previous Version: 20200214 E3_NSPI Pathways Study (PDF)
- CA Comments (PDF)
- 20200306 E1 Comments (PDF)
- 20200303 Synapse comments on Analysis Plan (PDF)
- IRP Modeling Results 2020 06 26 (PDF)
- IRP Modeling Results Tables 2020 07 06 (PDF)
2020 IRP - Initial Modeling Results
June 26, 2020
2020 IRP - Draft Findings, Action Plan, Roadmap
Modeling Results, Findings, Action Plan and Roadmap
Documents
- Appendix E IRP Modeling Results (PDF)
- Previous Version: IRP Modeling Results 2020 10 30 (PDF)
- Previous Version: IRP Modeling Results 2020 09 18 (PDF)
- Previous Version: IRP Modeling Results 2020 09 11 (PDF)
- Previous Version: IRP Modeling Results 2020 09 02 (PDF)
- IRP Draft Findings 2020 09 02 (PDF)
- IRP Modeling Results Tables 2020 10 30 (XLSX)
- Previous Version: IRP Modeling Results Tables 2020 09 17 (XLSX)
- Previous Version: IRP Modeling Results Tables 2020 09 02 (XLSX)
- IRP Rate Effect Model 2020 11 27 (XLSX)
- Previous Version: IRP Rate Effect Model 2020 09 17 (XLSX)
- IRP Participant Comments Draft Findings September 2020 (PDF)
- 20201106 Response to Comments on Findings Action Plan Roadmap (PDF)
2020 IRP - Final IRP Report
IRP Report, IRP Report Summary, IRP Appendices
2020 IRP - Draft IRP Report